Automation System
 Supplying Services
 Development Process

1. Process design
___Plant Simnulation

2. Design of dedicated facility
___Robot Simulation

3. Private Production
___Universal Purchase

4. Installation
___Equipment Stabilization

5. Interlocking Trial Operation
___Quality Stabilization

6. Local Installation
___Education / Training

 Develop Process
1. Process design
___Plant Simnulation
2. Design of dedicated facility
___Robot Simulation
3. Private Production
___Universal Purchase
4. Installation
___Equipment Stabilization
5. Interlocking Trial Operation
___Quality Stabilization
6. Local Installation
___Education / Training
 Application Example
 Major Customers

SHINYOUNG
HMC / KMC (LF, AD, TM, HI, OS, etc.)

SMART
HMMA (ADa, LFa, TMa, YFa, etc.)

PHN
HONDA (2CT, 2WF, TVAA)

PETERFORM, COSMA
HMMR (GSr, HCr, FB, FB CROSS) / NISSAN (WAVE1,2)

ZYBODY
CHERY (T21, A16, S12), QOROS (CF16)

COSMA(FORMPOL), ALLGAIER
GM (22A), DAIMLER(BR247, X243)

PEMSA
NISSAN (LO2D, L21B, L32H, X11C, H60A)

PEMSA
NISSAN (LO2D, L21B, L32H, X11C, H60A)